Loading...
2503 (2).tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 21BS16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: Contractor or Homeowner (if self of e- i' J Permit #: MS-2014- Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or ,of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered durin installation of the roof coverin s (R907.2) EXISTING COVERING WAS REMOVED: Existin ro coverin was removed for one of the reasons re by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existin vent flashin metal ed drain outlets, collars or metal counter-flashin were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (R907.6) Si nature of Rdrhary Installer Date 2e 4 " Qf Z / I ' fJ Sign ,ptune of Pern`#Hqrrder Date