2503 (2).tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
21BS16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address:
Contractor or Homeowner (if self of e- i'
J
Permit #: MS-2014-
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or ,of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered durin installation of the roof coverin s (R907.2)
EXISTING COVERING WAS REMOVED: Existin ro coverin was removed for one
of the reasons re by section R907.3
DID NOT USE RUSTED METAL OR FLASHING: Existin vent flashin metal ed
drain outlets, collars or metal counter-flashin were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
Si nature of Rdrhary Installer Date
2e 4 "
Qf Z
/ I ' fJ
Sign ,ptune of Pern`#Hqrrder Date