Loading...
1245.tif I t 2009 INTERNAU NA ' L RESIDENTIAL CODE CITY OF BLA RE Return to Blair City Hall prior to Final Inspection , 2'1BSI . 6 street, Blai NB 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements f to lowin this reroofing job. Permit M. 1 2, Installation Dat e .. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICI; PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed e to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof cov ering y erin system and the material and equipment loads ..; that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERII.G WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date � Signature of Primary Installer I . Date d. � Signature of Permit Holder �,� C