1245.tif I
t
2009 INTERNAU NA
' L RESIDENTIAL CODE
CITY OF BLA RE
Return to Blair City Hall prior to Final Inspection ,
2'1BSI . 6 street, Blai NB 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
f to lowin this reroofing job.
Permit M. 1
2,
Installation Dat e ..
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICI; PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's ed e to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof cov ering y
erin system and the material and equipment loads
..; that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERII.G WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date �
Signature of Primary Installer
I
. Date
d. �
Signature of Permit Holder �,�
C