1244.tif s
2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF B LAIR
Re turn to Blair City all prior to Final Inspection
8 B 6 �� Street, Blair, NB 08
�� � � � 008
2�
Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following
requireme
fot, (owing, this reroofing job.
Permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION CNSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's ed e to a point at least 24 inches inside the exterior
wall line of the building, (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loa ds
that will be encountered during in of the roof covering system. (R907.2)
S 1NG
IN
COVERG WAS REMOVED: Existing roof covering was removed for one
BSI T .
of the reasons required by section 807.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R907.6)
Date
Signature of Primary Installer
- I
9
Z61 Li
Date
Signature of Permit Holder
I
i