Loading...
1244.tif s 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF B LAIR Re turn to Blair City all prior to Final Inspection 8 B 6 �� Street, Blair, NB 08 �� � � � 008 2� Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requireme fot, (owing, this reroofing job. Permit #: Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION CNSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed e to a point at least 24 inches inside the exterior wall line of the building, (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loa ds that will be encountered during in of the roof covering system. (R907.2) S 1NG IN COVERG WAS REMOVED: Existing roof covering was removed for one BSI T . of the reasons required by section 807.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (R907.6) Date Signature of Primary Installer - I 9 Z61 Li Date Signature of Permit Holder I i