1078 (2).tif _I
i
Aug.22.2014 03:10 PM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 3/ 4
Eau 1wft IAL(;(jUE
""'0091"TEKNA11UNALK bUtIVI
z N
CITY OF 13LAIR REROOFING CHECKOFF SHEET
Re turn to B la Ir ci ty aw prior to Final Inspect I
1 `1 n M,- Blair, NE 6800
c aused by the gnfeasibility to'Perfcrm detailed irlsPectlons Wh rem would l�eo�uss► of limitations � cease trtdiGate com,piisnos With the following rah
Interfere with reroofing work, �
foils . r� tn� thle reroofing Job,
psrn�lt M Y ao\ o
-------------
in
atallatlon gate;
NO
ale and methods of application used for recovering or rep the existing
Yho teat er i
roof covering comply with the requirements of the building code. (RWA)
D tiTALL�� !fin loe barrier that
consists of at Ieast two layers 'Of
t_ l n'+odlfld i1tumenlee vitae sn fallei and
underlayment or Of a self - adhering l P" I s �Olym
extend
leasf the eave's ed a to a polnt at east 24 ' of es �slde the aeri�r
rat
wall line of the building. (8905 -2JA)
t�t�T�1�AL ��}lllll'D��1� S AR1~ SaU3+lD: T 11 structural roof com �O
capable 6f supposing the roof coveting sy
stern and the mgterial and oq, l mVIt loiade 0�
'
that will l� e encountered during Installation of the roof covering systerrf,
k
5Rt G
AS 1�PM - V��: xistIlIg roof covering was removed for one
of the reasons raquir• d by sootion 8907.3
pUsTpD MeTAL OR PLASHING' �xlsting vent flashing► metal edges, d rain
collars or metal counter- flashing were no t reinstalled if Lusted, (R907.6)
outlets,
1 A,S
' �,�Tp,tt.l�a P 0 P� �,lry� l'taahing shall he r�oonstruoted In a�c�rd�no�
with approved manufacturar's installation instructions. Meal a hing to #gin, (�gU7.�)
bituminous materials are to be adhored shall be priMsd l? t
a
y l�t t Signatur of Pr ma instalr lea
, 7-TM p , ,
i
Date
Big" aturo of Permit Holder
a