399.tif x
2009 INTERNATIONAL RESIDENTIAL CODE
}
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City all prior to Final Inspection
to Y p p
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements j
following this reroofing job.
Property Address: y
N Y
Contractor or Homeowner (if self) : `
Permit #: MS- 2014 - ,..
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) k
j
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are f
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system.. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3 i
, t
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PRO PERLY; Flashing shall be reconstructed in accordance j
with approved manufacturer's installation instructions. Metal flashing to which
bituminous niaterls are to be adhered shall be primed prior to installation. (R907.6)
r
Signature of Pri Instfillb ated
,.
i of Permit Holder Date