Loading...
399.tif x 2009 INTERNATIONAL RESIDENTIAL CODE } CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City all prior to Final Inspection to Y p p 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements j following this reroofing job. Property Address: y N Y Contractor or Homeowner (if self) : ` Permit #: MS- 2014 - ,.. Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) k j ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are f capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system.. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i , t DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PRO PERLY; Flashing shall be reconstructed in accordance j with approved manufacturer's installation instructions. Metal flashing to which bituminous niaterls are to be adhered shall be primed prior to installation. (R907.6) r Signature of Pri Instfillb ated ,. i of Permit Holder Date