Checkoff Sheet MS-2014-00708_0001.tif i
09/05/2014 15:54 7790112 GOEDEN CONSTRUCTION PAGE 01
INTEKE NATIONAL RES IDENTI AL
CI OF 13LAIR REROOFIP4G' CHECKOFF SHEET
Return to lair City Hall prior to Final Inspection
21 8 S 16 Street, Blair, NE 88008
Because of limitations caused by the Infeasibility to perform detailed Inspections which would
no Interfere with reroofing work, please Indicate compliance with the following requirements
f 29 2 - w - l — ng thIs reroofing job,
Property Address: / r3
Contractor or Homeowner (if salf)
i
Permit*: MS -2014` 07 6
I nstallation Date:
f z
YES No
i l Cl The materials and methods of application used for r ecove r ing
roof covering comply with the requirements of the building code'. (R90� replaci the existing
ICE PROTECTIO I NS
ALLEEC: An ice barrier that consists of at feast two layers of I
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at bast from tha _eave's edge to a !saint at least 24 i uhes inside the exterlor
wall line of the building. (R905..7.1)
�❑ STRUCTURAL COMPONENTS ARE SC '
SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
❑ rixiSTING Q OVERING WAS REMOVED: Existing ropf covering was removed for one
of the reasons required by section 8907.3
❑ bldg N T USE= RUSTED _MET& OR FLASHING: Existing x�sting vent flashing, metal edges, i
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASH G INSTALLED R t_PERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
i
►ignat r Primary Ins oiler Date
1gnature vermit Holder Dato