MS-2014-00379_0001.tif INTERNATIO RESIDENTI NTIL
CITY OF BLAIR ROOFING CHECKOFF SHEET
Return to Blair C ity Hall prior to f=inal Inspection
218 S 16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit
Installation Date:
b
YES NO
❑ The materials and methods of application used for recovering r replacing 9 p g the existing i
roof covering comply with the requirements of the building code. (R907.1)
I,
® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed
and
extends al least from the ague's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
/U' ❑ EXISTING COVERING WAS REMOVED! Existing roof covering
of the reasons required by section R907.3 was removed for one
❑ NO RUSTED METAL OR FLASHING: Existing t ng vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTAL
LED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which i
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sig ure of Prima installer (� S ~
ry ailer Dat
e
I
Sig ure of P it Bolder !
Date !