Checkoff Sheet MS-2014-00430_0001.tif i
09/07/2014 09:04 4025331110 LOGAN CONSTRUCTION PAGE 02/02
INTERNATIONAL T .
ITT OF BLAIR REROOFING HEC F SHEET
Return to Blear City Hell prior to Final inspection
218 S 16 t " Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Property Address: -
Contractor or Homeowner (if self) : C7 rl _
Permit #: MS-2014- ( `-
Installation late: z gu J +
YES NO
_ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R007.1)
ICE PROTECTION It
STAL[_EG An ice barrier that consists of at least two layers of
underlaymentOF of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge_ to •e point at Ieast 24 inches inside the exterior
-wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable cif supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges,
drain outleta, coJWra or metal counter- flashing were not reinstalled if rusted. (11007.5)
FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sig to of ' ry Installer Date
K;k - , _/ 9-6,/q
Si u a er Date