Loading...
Checkoff Sheet 2167_0001.tif i i Sep, 5. 2014 9:22°6AM Thompson & Thompson Roofing No,4089 K 1 1 I CITY F BLAIR REROOFING SCOFF SHEET Return to glair City Hall prior t0 Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fallowing this reroofing job. Property Address: - 7 - ?7 P 16' 5 Contractor or Homeowner (if self) sin 3 s J Permit #: MIS- 2014y A'?J 6- Installation Data: i YES NO ❑ The materials and methods of application used for recovering cr replacing the existing roof covering comply with the requirements of the building code (8907.1) i ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at Ieast from the eave's edge to ,a point at least 24 inches inside the exterior wall'llne of the building. (8805.2.7.1) I ❑ STRUCTURAL COMPONENTS ARE SOUNth The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8007.5) ❑ FLASHING INSTALLED PROPERLY:. Flashing shall be reconstructed in accordanco with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907,0) Sicdnature of rimy Insta11 date Signature of Permit Holder Date