Loading...
Checkoff Sheet 1658_0001.tif i 2009 INTERNATIONAL RESIDENTIAL CODE REROOFING CHECKOFF CITY OF BLAIR R SHEET � Return to Blair city Hall prior to Final Inspection 2'18 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility come�i d etai l ed the i nspections following requirements woul not interfere with reroofing work, please indicate complian following this reroofing job. Permit #; Installation Date; 9( YES NO d ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) PROTECTION INSTALLED: An ice barrier that consists of at least two layers of ICE underlayment or of aself- adhering polymer modified bitumen sheet wa s installed and extends at least from the eave's edge to a point at least 24 inches Inside the exterior wall line of the building. (R905.2.I. ) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof coverigsystem fi sp the the covering systema(R907.2) that will be encountered during installa ® ® EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain ® outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) [� FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer s installation instructions. Metal flashing to which bituminous mater!als are to be adhered shall be primed prior to installation. (R907.6) Agana re of Primary Installer Date 3 ry Date Signature of PermiAHo de r