Checkoff Sheet 1658_0001.tif i
2009 INTERNATIONAL RESIDENTIAL
CODE
REROOFING CHECKOFF
CITY OF BLAIR R SHEET �
Return to Blair city Hall prior to Final Inspection
2'18 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility come�i d etai l ed
the i nspections
following requirements
woul not interfere with reroofing work, please indicate complian
following this reroofing job.
Permit #;
Installation Date; 9(
YES NO
d ® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
ICE
underlayment or of aself- adhering polymer modified bitumen sheet wa s installed and
extends at least from the eave's edge to a point at least 24 inches Inside the exterior
wall line of the building. (R905.2.I. )
®
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof coverigsystem
fi sp the the covering systema(R907.2)
that will be encountered during installa
® ® EXISTING COVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
® outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
[� FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer s installation instructions. Metal flashing to which
bituminous mater!als are to be adhered shall be primed prior to installation. (R907.6)
Agana re of Primary Installer
Date
3 ry
Date
Signature of PermiAHo de r