Loading...
Checkoff Sheet 353_0001.tif Sep 04 2014 12:49PM HP Fax page 2 Sep 04 14 11:27a Allison Biaich 402 - 933 -2995 p.2 2009 INTER'NATIONAL R A . I C ITY OF BLAIR IN T Return to Blair City Hall prior to Final Inspection 218 B 16 Street, Blair, NE 68848 Because of limitations caused by the Infeasibility b? perform detailed Inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing Job. Property Address. - j/ Contractor or Homeowner (if self) : ,/45S L /7 ", �� � L 6 � Permit a: MS-2014- UOW 0 .S Installation Data: - YES h10 ❑ The materials and methods of application used for recovering or replacing the existing roof covering gomply wth the requirements of the building code, (8907.1) ❑ ICE PRO fECTION INSTALLED: An ire barrier that consists of at least two layers of underiayment or of a self- adhering polymer modified bitumen street was installed and extends at least from the eave's edg to a paint at least 24 inches inside the exterior -wall line of the building. (R905.2.7, 1) ❑ STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are capable of supporting the roof covering system and the material anti equipment loads that will be encountered during Installation of the roof covering system,. (8907.2) ❑ OUSTING COVERING WAS Rr=M0 Vl=0: Existing roof covering was removed for ane Of the reasons required by section 8907.3 " DID NOT USE RUSTED METAL OR (=LASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous n aterials are to be adhered shall be primed prior to installation. (8907.6) Signature of Pr Date Signmti ro of PeAitC41 r date I