Return to Blair City Hall prior to Final Inspection
218 B 16 Street, Blair, NE 68848
Because of limitations caused by the Infeasibility b? perform detailed Inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements
following this reroofing Job.
Property Address. - j/
Contractor or Homeowner (if self) : ,/45S L /7 ", �� � L 6 �
Permit a: MS-2014- UOW 0 .S
Installation Data: -
YES h10
❑ The materials and methods of application used for recovering or replacing the existing
roof covering gomply wth the requirements of the building code, (8907.1)
❑ ICE PRO fECTION INSTALLED: An ire barrier that consists of at least two layers of
underiayment or of a self- adhering polymer modified bitumen street was installed and
extends at least from the eave's edg to a paint at least 24 inches inside the exterior
-wall line of the building. (R905.2.7, 1)
❑ STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are
capable of supporting the roof covering system and the material anti equipment loads
that will be encountered during Installation of the roof covering system,. (8907.2)
❑ OUSTING COVERING WAS Rr=M0 Vl=0: Existing roof covering was removed for ane
Of the reasons required by section 8907.3
" DID NOT USE RUSTED METAL OR (=LASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous n aterials are to be adhered shall be primed prior to installation. (8907.6)