Checkoff Sheet 2154_0001.tif i
i
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 27129
2009 RESIDENTIAL COD
C ITY OF BLAIR REROOFING CHECKOFF S HEET
Return to Blelr City Hall prior to lFilnai Inspection
218816 1h Street, Blair, NE 68008
Because of limitation$ caused by the Infeasibility to'porform detailed Inspections which would
not interfere with reroofing work, please Indicate compliance with the fallowing requirements
following this reroofing Job,
Permit #r �A 1 { — ate .
Installation bate: � � .. _ - .......
YES No
❑ The materials and methods of application used for recovering or replacing the existing
roof novering comply with the requirements of the building code. (R907.1)
❑ ICE PP. TECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at leapt from the eave's edge to a point at least 24 inches inside the exterior
wall line of the Building. (R9DS.2.7.1)
STRUCTURA COMPONENT RARE SOUND: The structural roof components are
I
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED, Exlsting roof covering was removed for one
of the reasons required by section R907-3
❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted, (R907.5)
❑ FL AsH1Ne INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturar's installation instructions. Me tal flashing to which
lalt `Woos materials are to be adhered shall be pruned prier to installation. (R947.6)
Signature of Primary taller bate
Signature of Permit HoI r Pate
i
i
i