Loading...
Checkoff Sheet 2154_0001.tif i i 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 27129 2009 RESIDENTIAL COD C ITY OF BLAIR REROOFING CHECKOFF S HEET Return to Blelr City Hall prior to lFilnai Inspection 218816 1h Street, Blair, NE 68008 Because of limitation$ caused by the Infeasibility to'porform detailed Inspections which would not interfere with reroofing work, please Indicate compliance with the fallowing requirements following this reroofing Job, Permit #r �A 1 { — ate . Installation bate: � � .. _ - ....... YES No ❑ The materials and methods of application used for recovering or replacing the existing roof novering comply with the requirements of the building code. (R907.1) ❑ ICE PP. TECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at leapt from the eave's edge to a point at least 24 inches inside the exterior wall line of the Building. (R9DS.2.7.1) STRUCTURA COMPONENT RARE SOUND: The structural roof components are I capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED, Exlsting roof covering was removed for one of the reasons required by section R907-3 ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted, (R907.5) ❑ FL AsH1Ne INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturar's installation instructions. Me tal flashing to which lalt `Woos materials are to be adhered shall be pruned prier to installation. (R947.6) Signature of Primary taller bate Signature of Permit HoI r Pate i i i