Loading...
Checkoff Sheet 2152_0001.tif i 09/0212014 14:49 4025027575 C AND S ROOFING INC PAGE 28/29 INTERNATIONAL I 1 M L. CODE C ITY OF B LAIR REROOFING CHECKOFF SHEET Return to Blair City ball prior to Final Inspection 218 S 1 (0 S treet, Stair, NE 88008 Because of Iimitations caused by the infeasibility to perform detailed inepectlons which would not interfere with reroofing work, please indicate compliance with the following requirements following thi 11s{ reroofing job. Permit #: aao 114 - G a s q 21462 Installation Date : ... YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cede. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7_1) STRUCTURAL COMPONENTS ARE SOUN13 The structural roof components are capable of supporting the roof covering system and the material and equipment lords that will be encountered during installation of the roof covering system: (8907.2) EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 �T C3 NO' RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6) FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance } with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Prim Installer Date Signature of hermit Ha der Date I i i