Checkoff Sheet 2152_0001.tif i
09/0212014 14:49 4025027575 C AND S ROOFING INC PAGE 28/29
INTERNATIONAL I 1 M L. CODE
C ITY OF B LAIR REROOFING CHECKOFF SHEET
Return to Blair City ball prior to Final Inspection
218 S 1 (0 S treet, Stair, NE 88008
Because of Iimitations caused by the infeasibility to perform detailed inepectlons which would
not interfere with reroofing work, please indicate compliance with the following requirements
following thi 11s{ reroofing job.
Permit #: aao 114 - G a s q 21462
Installation Date : ...
YES No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building cede. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7_1)
STRUCTURAL COMPONENTS ARE SOUN13 The structural roof components are
capable of supporting the roof covering system and the material and equipment lords
that will be encountered during installation of the roof covering system: (8907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907.3
�T C3 NO' RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6)
FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance
} with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signature of Prim Installer Date
Signature of hermit Ha der Date