Loading...
Checkoff Sheet 2151_0001.tif - i i 09/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 29/29 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prier to Final Inspection 218S16 th Street, Blair, NE 00000 Because of limitations caused by the infusibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followings this reroofing job. r Permit #. L1UMIC Installation Crate. YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the (wilding code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment [oads that will be encountered during installation of the roof covering systern. (8.907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing.shall be reconstructed in accordance with approved manufacturer's installation instructions- Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Inst Her Date Signature of Permit f4o Date I