Loading...
Checkoff Sheet 2110_0001.tif 2009 INTERNATIONAL RESIDENTIAL E CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection M S 16th Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit 2 Installation Date: YES NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ (CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of under {ayment or of aself- adhering polymer mer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R906.23.1) STRUCTURAL COMPONENTS ARE SOUND: p Thestruct terial and qu pment loads capable of supporting the roof covering system and th that will be encountered during installation of the roof covering system. (8907.2) �+ ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i A Ot u r e rimary Installer Date i 0 j � Permit Holder Date i i