Checkoff Sheet 2110_0001.tif 2009 INTERNATIONAL RESIDENTIAL E
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
M S 16th Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit
2
Installation Date:
YES NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ (CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
under {ayment or of aself- adhering polymer mer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R906.23.1)
STRUCTURAL COMPONENTS ARE SOUND: p Thestruct terial and qu pment loads
capable of supporting the roof covering system and th
that will be encountered during installation of the roof covering system. (8907.2)
�+ ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i A Ot u r e rimary Installer Date
i
0 j
� Permit Holder Date
i
i