Checkoff Sheet 1831_0001.tif I
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 25/29
2009 INTERNATIONAL RESIDENTIAL CODE
CITY I OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair.City Hall prior to Final inspection
21 8 S' 1 6 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perfawm detailed Inspections which would
not interfere with reroofing work. please Indicate compliance with the following requirements
following this reroofing job.
Permit f#: �` c � l L.j 1 2 - 32-5 A yl v" f'.
Installation Data:
YES NCB
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R$07.1)
Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underiayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8007.2)
EXISTING COVERING WAS R15-MOVED.- Existing roof covering was removed for one
of the reasons required by section 8907.3
[� NO RUSTE METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, cellars or metal counter-flashing were not reinstalled if rusted. (R907.5)
Q FLASHING INSTALLED PRQP"ERLY.'Flashing shall be reconstructed in accordance
with approved' manufdcturees installation instructions. Metal flashing to which
bitumino s terials are to be adhered shall be primed prior to installation. (R9O7.6)
q
Signature of Primary Installe 0 Date �f
Signature of Permit Ho dear Date