Loading...
Checkoff Sheet 1775_0001.tif �I i I 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 26/29 INTERNATIONAL ID NTIAL C ITY OF BI AIR REROOFING CHECKOFF SHE Return to Blair city Hall prier to Final inspection 21 1 D street, glair, NB 68008 Because of limitations caused by the infeasibility to'perform detalled inspections which would not interfere with reroofing work, please indicate compliance with the fallowing requirements f oil owino this reroofing job, hermit #: - c 14 ., Installation MO. YES - NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) [I ICE PRQTI =CT QN INSTALLED: An ice barrier that consists of at least two layers of underiayment car of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least ln inches inside the exterior wall line of the building. STRUCTURAL CtOMPONENT$ ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ElST1NG GIJVERIi WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 No RUSTED METAL OR &ASH1NG. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing ware' not reinstalled if rusted. (8,907.5) 1:LA8 Jl G INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminou aterials are to be adhered shall be primed prier to installation. (R907.6) Signature cif PAys le pate I Signature of Permit Holder Gate I i