Checkoff Sheet 1775_0001.tif �I
i
I
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 26/29
INTERNATIONAL ID NTIAL
C ITY OF BI AIR REROOFING CHECKOFF SHE
Return to Blair city Hall prier to Final inspection
21 1 D street, glair, NB 68008
Because of limitations caused by the infeasibility to'perform detalled inspections which would
not interfere with reroofing work, please indicate compliance with the fallowing requirements
f oil owino this reroofing job,
hermit #: - c 14 .,
Installation MO.
YES - NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
[I ICE PRQTI =CT QN INSTALLED: An ice barrier that consists of at least two layers of
underiayment car of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least ln inches inside the exterior
wall line of the building.
STRUCTURAL CtOMPONENT$ ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
ElST1NG GIJVERIi WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
No RUSTED METAL OR &ASH1NG. Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing ware' not reinstalled if rusted. (8,907.5)
1:LA8 Jl G INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminou aterials are to be adhered shall be primed prier to installation. (R907.6)
Signature cif PAys le pate
I
Signature of Permit Holder Gate
I
i