Checkoff Sheet 1681_0001.tif 09/02/2014 14:49 4025027575 O AND S ROOFING INC PAGE 21/29
I
009 INTERNAT,IONAL RESIDE +
lT" OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall Prior tO Final IinsPeaflo n
218 s I e street;, Blair{, NE 6$008
not 13 8 caU se
I of Fere wit lth her ofin� fanged by t , p lease Ind icate aarnpl knoo wI deta requir ments
not vu roo �nrark
followin Ws reroofing Job.
permit #: "` o I Li - 1 '' 3
L \
YES NO
� 'The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) .
ICE PRO`CEC` ZION INsTAI_LED An lea barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified biturnen sheet was was i stalled and
extends at least from the cave's ed a to a point at lea i t 24' ches inside file exterior
wall line of the building, (R905.;�,7 -t)
STRLICTt,IF�AL, C )MOMENTS ARC ;5OU : The st ructural e material and equipment loads
capable 6f supporting the roof covering system and th
. , that will be encountered during installation of the roof covering system- (8907.2)
l '
EXISTING C REl1![C�Vi~A: E> fisting ro6f covering was r'amoved for one
of the reasons required by section p,90 7.3
, l ,No RUSTED �!►ETAL C7i� I= LA�HINO existing vent hashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907 -5)
[� PI HIND INSTALLED PROP I.11: Flashing shall he reconstructed in acoordance
with approved manufacturers Insta4ation instructions. Metal flashing to which 6
biturninous materials are to ha adhered shall be primed prior to installation. (R0
Si Insta
ure of Prima Installer Date
�' pate
Signature of Permit Hal r