Loading...
Checkoff Sheet 1680_0001.tif i 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 22129 2009 INTERNATIO RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Nair City Hall prior to Fibs[ Inspection 218 S 'I6 Street, Nair, NE 60000 -- I Because of 11mitatione canted by the Infeasibility to'perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the follniOng requirements following this reroofing Toby l�errnl #,. ` 1 1 l' 1 L}'Z 's ra t - , Installation Date- YES No The materials and methods of application used for recovering or replacing the m lsting roof covering comply with the requirements of the building code. (R907.1) [CE PROTECTION INSTALLFEl : An lea barrier that consists of at least two layers of underlaym5r<t or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the egIn edema to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are capable 6f .supporting the roof covering system and the material and equipment loads that wit[ be, encoun tered during installation of the roof covering system. (R907.2) I EXISTING COVERING 111i'AS REMOVED: Existing roof Covering was removed for one j of the reasons required by section 8.907.3 No RUSTED METAL, 0R FLASHii_O' l xisting vent flashing, metal edges, drain outlets, collars -or rr'retal counter - flashing were not reinstalled if rusted. (R907.5) . ELASHINO INSTALLED PRQk'ERLY: Flashing shall he reconstructed in accordance With approved'rrianufacturefs installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R007.5) Signature of Primary Inst 1 or Date { q- , Signature of Permit Holder Date I