Checkoff Sheet 1680_0001.tif i
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 22129
2009 INTERNATIO RESIDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Nair City Hall prior to Fibs[ Inspection
218 S 'I6 Street, Nair, NE 60000 --
I
Because of 11mitatione canted by the Infeasibility to'perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the follniOng requirements
following this reroofing Toby
l�errnl #,. ` 1 1 l' 1 L}'Z 's ra t - ,
Installation Date-
YES No
The materials and methods of application used for recovering or replacing the m lsting
roof covering comply with the requirements of the building code. (R907.1)
[CE PROTECTION INSTALLFEl : An lea barrier that consists of at least two layers of
underlaym5r<t or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the egIn edema to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are
capable 6f .supporting the roof covering system and the material and equipment loads
that wit[ be, encoun tered during installation of the roof covering system. (R907.2)
I
EXISTING COVERING 111i'AS REMOVED: Existing roof Covering was removed for one j
of the reasons required by section 8.907.3
No RUSTED METAL, 0R FLASHii_O' l xisting vent flashing, metal edges, drain
outlets, collars -or rr'retal counter - flashing were not reinstalled if rusted. (R907.5)
. ELASHINO INSTALLED PRQk'ERLY: Flashing shall he reconstructed in accordance
With approved'rrianufacturefs installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R007.5)
Signature of Primary Inst 1
or Date
{ q- ,
Signature of Permit Holder Date
I