Checkoff Sheet 1679_0001.tif I
f :
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 24/29
x,00 ► INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Re urll to Blur city Hall' prior to Final Inspectio n
218 S'l StrGOt, Blair, NE 68008
Because of limitations ,caused by the infeasibility to detailed Inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
i@kVina this reroofing job.
- 7 "o c V" l j
Permit #:
i
I bate;
^�y
Y"5 S N0
The materiala and methods of application used for recovsring or replacing the w isting
roof covering comply with the requirements of the building code. (8907 -1)
i
ICE pRt]TI�CTION INSTALLED An ice barrier that consists of at least two layers of
underiayment or of a self-adhering polymer modified bitumen sheet was insta and
tatted
extends at least from the eave's ed a to a point at least 24 inches inside the exterior
wall line of the building, (R905.2.7.1)
STRUCTIIRAI CC3MPtN�I'i ARRI; S[)U D: The structural roof companenfis ara
capable df supporting the roof covering system and the material grid equipment loads
. , that will be encountered during installation o�fthe roof covering system, (99t�7.2)
F-( STING COVERING 1NAS RF-MaVEp: EAsfing roof covering was removed for one
of the reasons required by section 8907.3
No RUSTED METAL OR > xiating vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted, (8907.5)
ed in accordance
FLASHING INSTALLE D pRDPERI -fir, Flashing shall be. reconstruct
with approved manufacturer's installation instructions. Metal flashing to which j
shall be prirned prior to installation. (11907.
bi uml oua materials are to be adhered
q-
Signature
of primary l st or Date
Signature of permit Hold r date