Loading...
Checkoff Sheet 1679_0001.tif I f : 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 24/29 x,00 ► INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Re urll to Blur city Hall' prior to Final Inspectio n 218 S'l StrGOt, Blair, NE 68008 Because of limitations ,caused by the infeasibility to detailed Inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements i@kVina this reroofing job. - 7 "o c V" l j Permit #: i I bate; ^�y Y"5 S N0 The materiala and methods of application used for recovsring or replacing the w isting roof covering comply with the requirements of the building code. (8907 -1) i ICE pRt]TI�CTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self-adhering polymer modified bitumen sheet was insta and tatted extends at least from the eave's ed a to a point at least 24 inches inside the exterior wall line of the building, (R905.2.7.1) STRUCTIIRAI CC3MPtN�I'i ARRI; S[)U D: The structural roof companenfis ara capable df supporting the roof covering system and the material grid equipment loads . , that will be encountered during installation o�fthe roof covering system, (99t�7.2) F-( STING COVERING 1NAS RF-MaVEp: EAsfing roof covering was removed for one of the reasons required by section 8907.3 No RUSTED METAL OR > xiating vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted, (8907.5) ed in accordance FLASHING INSTALLE D pRDPERI -fir, Flashing shall be. reconstruct with approved manufacturer's installation instructions. Metal flashing to which j shall be prirned prior to installation. (11907. bi uml oua materials are to be adhered q- Signature of primary l st or Date Signature of permit Hold r date