1607_0001.tif 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 17/29
INTERNA TIONAL RESIDENTIAL -
ITY OF BLAIR CHECKOFF SHEET
Return to Blain City Hall ' prior to F Inspection
218 'I 6 Street, Blair, NB 6500'
. i
Because of limitations caused by the infeasibility to - parform detailed Inspections Which would
not interfere with reroofing wont, please Indicate compliance with the following requirements
farlowiing. this �� rarocfing job.
Permit l"t 1 --1 ( 1 0,3X4 Q e'O sko', � ,
Installation Dato.
YES NO
The materials and methods of appilcatlon used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R007.1)
ICB I PMECTION IN STALLED: An ice barrier that consists of at least Mo layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eve's edge to a point of least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are
ea.pable of supporting the roof covering system and the material and equipment lauds
that will he encountered during Installation of the roof covering system. (R,007.2)
I•STING 6OVE [N WAS ROVIOVED; Existing roofcovering was removed for one
of the reasons required Icy section R.007.3
No R jaTFR M FLASHING: Existing �tant flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted, (RB07.6)
. PLA,SHING INSTALLEn P gLF_E LY• Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bitu inou materials are try be adhered shall be primed prior to installation. (8007.5)
Signature 6 Primary atEllier pate
Signature o*Permit o der Gate