Loading...
Checkoff Sheet 1872_0001.tif 09 INTERNATIONAL RESIDE CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 2188 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followinct this reroofing job. Permit #: P\S 2.D 14 0 1 7 D 4- C ,.�. ( -..•�s ¢h Installation Data: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers Of � underlayment or of aself- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of.the building. (R906.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the ,roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance Ltr with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) A�7z ®. -�y Signature of Prmaffinstaller Date 'I I� �-;Zc) 1 - 1''�g� Date Signature of Permit Holder i