Loading...
Checkoff Sheet 1312_0001.tif I i 09/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 19/29 2009 INTERN ATIONAL RESIDENTI CITE( OF BLAIR REROOFING CHECKOFF SHEET Rafulrn to Blair MY ball' prior to Final inspection 2'1 S Ii strut, Blair, NE 68068 Because of limitations caused by the Infeasibility to*perforni detailed Inspections which would _not intailere with reroofing work, Tease indicate complianCO vvlt>h the following requirements following this reroofing job. Permit 0'. Instaliatlan pats: � �� � } �� YES NO , The materials and methods of application used for recovering or replacing the existing roof covering aumply with the requirements of the building code. (8807.1) ICE ppo'rg0Tl0N'INSTALLEI); An ice barrier that oonsists of at least two layers of > inderiayment or o#' a self adhering polymer rriodifled bitumen s h ee t was Installed and extands at least from the eavda ed a to a point at least 2A inches Inside the exterior wall line of the building, (11905.2,7.1) B`#' CTURAL. COMPONENTS ARE SOUND' The struotural roof componants are capable cif supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) EJiI T1N Ct VFRI O E' RElVIOVF Existing roof dovering was removed for one of the reasons required by section 8907.3 No F;llSTEI] 11tlETAt Old F1�ASHINC. Pxisting vent flashing, metal edges, drain outlets, o ©liars or metal counter hashing were not reinstalled if rusted. (8,907.5) [ FLASHING iNSTALLBI� PROPERLY: Flashing shall be reconstructed in accordarice with approved manufacturers insta ilafiion instructions• Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (F2907.0) Signature of P mary In tier pate q- 2� L - 1 Date Sicginature o Permit Ho l er E