Checkoff Sheet 1188_0001.tif i
I
I
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 16/29
2009 INTERNATION"Al. RESIDENTIAL COQ - �
C ITY OF FLAIR REROOFING I� k� FF SH
Return to Blair city gall' prig to Final Inspection '
218 8 16 Street, Blair, NE 6800
Because of limitations caused by the infeasibility to detailed lnspectlona which would
not interfere with reroofing work, please indicate compliance with the fallowing requlremente
;Co Mowing thle reroof[ng lob.
Permit 9.
instaffatlan Date: . - 7- D" -4 �-1
YES NO
The materials and methods of application used for recovering or replacing the w/isting
roof covering comply with the requirements of the building code, (8007.1)
ICF pRQT ]N INSTALLI D An ice harrier that consists of at least two layers of
underiayment or of a self polymer modified bitumen sheet was irtstalle A and
extends at [east frQm the eaye's edcre to a point at least 24 rrahes I s'de the exterior
wall lire of the building. (R906.2,7.9)
5 RIdGT> iR�t. G01V1PD�IENTS ARE SOUMD. The structural roof oomponents are
cmpable of supporting the roof coveting system and the material and equipment toads
s that Wlil loo encountered during installation of the roof oovering system. (RW7.2)
�? CISTIN C(1II�f2I["dG vVAS RF_M VED: Existing roof covering was removed for one
of the reasons required by section R907.3
(� lti0 Ri1STED SET metal counter-flashing E
hln were not reinstalled metal drain
outlets, collars or m g
FLp $HINC3 iNSTALLFD prtopjRLY= plashing shall be reconstructed In accordance
with approved rn
anufacturees installation instructions. Metal flashing to which
hifumino s materials are to be adhered shall be primed prior to installation. (8907.6)
Signature of unary Ins a Ier
Date -
q - -)L
Signature of Permit Ho or Dot°
f
i
i
i
I
i