2009 INTERNATIONAL RESIDENTIAL CODE -
ITY OF B AIR REROOFING CHECKOFF SHEET
Return to Blair City Hall' prior to Final Inspection
218S 16 Blair, NE 6800-
13eaause of limitations caused by the infeasibili#y to`perlorm detailed Inspections which would
not interfere with reroofing work, pleass indicate compliance with the following requirements
fcllg this reroofing job.
Pennit 9:
Installation Date% �7
i
YES Nth
Mr 11 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R807.1)
'ICE FROTEC TION INSTALLED: An ice bawler that consists of at least two layers'af
underlayment or of a self- adhering polymer rriddi'hed bitumen sheet was installeg and
extends at tease from the eave's edge to a point at least 24, inches. Inside the wdertor
wall line of tha building. (R905.21A) —
STRUCTURAL CO MPONENTS ARE SOU 13: 'The structural roof components are
capable df supporting the roof covoring system and the material and equipment loads
' that Wit be encountered during installation of the roof covering system. (R9O7.2)
I1 EXISTING 60VERING WAS REMOVED= Existing roof covering was removed for one
of the reasons required i y section 1 907.3
C NO RUSTED METAL, OR F MSHI G: Existing vent flashing, metal edges, drain
otdlat% collars or metal counter flashing were not reinstalled if rusted. (R907.6)
F LASHING INS - ALLF -D PROPhRI. - ii lashing shall be reconstructed in accordance
with approved manufacturer's lnstallatlon instrucflons. Metal flashing to which
bit rninoue materials are to be adhered Asti be pruned prior to installation. (11907A
Slgnatu a of lyrl= Insta er Date