Loading...
Checkoff Sheet 1056_0001.tif i I i 09/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 15/29 • i 2009 INTERNATIONAL RESIDENTIAL CODE - ITY OF B AIR REROOFING CHECKOFF SHEET Return to Blair City Hall' prior to Final Inspection 218S 16 Blair, NE 6800- 13eaause of limitations caused by the infeasibili#y to`perlorm detailed Inspections which would not interfere with reroofing work, pleass indicate compliance with the following requirements fcllg this reroofing job. Pennit 9: Installation Date% �7 i YES Nth Mr 11 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R807.1) 'ICE FROTEC TION INSTALLED: An ice bawler that consists of at least two layers'af underlayment or of a self- adhering polymer rriddi'hed bitumen sheet was installeg and extends at tease from the eave's edge to a point at least 24, inches. Inside the wdertor wall line of tha building. (R905.21A) — STRUCTURAL CO MPONENTS ARE SOU 13: 'The structural roof components are capable df supporting the roof covoring system and the material and equipment loads ' that Wit be encountered during installation of the roof covering system. (R9O7.2) I1 EXISTING 60VERING WAS REMOVED= Existing roof covering was removed for one of the reasons required i y section 1 907.3 C NO RUSTED METAL, OR F MSHI G: Existing vent flashing, metal edges, drain otdlat% collars or metal counter flashing were not reinstalled if rusted. (R907.6) F LASHING INS - ALLF -D PROPhRI. - ii lashing shall be reconstructed in accordance with approved manufacturer's lnstallatlon instrucflons. Metal flashing to which bit rninoue materials are to be adhered Asti be pruned prior to installation. (11907A Slgnatu a of lyrl= Insta er Date -2 _. 9 � L Signature *Permit der Date i i i