Loading...
Checkoff Sheet 1055_0001.tif i I 0910212014 14:49 4025027575 C AND S ROOFING INC PAGE 14129 TIONAL RESIDENTIAL CODE - 2009 INTERN ' 11 ' IT'S F LAS REROOFING CHECKOFF SHEET Return to SlaIr City Hall' prior to Final Inspection 218 1 �r Street, Blair, NE 68008 Because Of limitations caused by the Infeasibilityto'perform detailed Inspections which would not interfere with reroofing work, please Indleate compllanes with the fallowing requirements oIiowinn this reroofing job. f i hermit #; ` c �il1 fi l Q �� -C, Installation Cate: LI I YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8997,1) Q I PROTEc INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was lri8talled and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) — C1 STRUCTURAL, COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered durincg Installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907,0 � ® NO RUSTED METAL OR FLASHIN : Existing'vent flashing, metal edges, drain outlets, collars or,tnetal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PR l]PERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructlons. Metal flashing to which bituminous materiala are to be adhered shall be primed prior to installation. (8907.6) q-2-f L1 Signatura o rimary ns ller Date Signature of Pert Hold r date �— L