Loading...
Checkoff Sheet 764_0001.tif I I 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 13/29 + I ' I I I INTER NATIONAL RESI DENT CITY OF B[ AIR REROOFING CHECKO S H EET Return t Blalr i y Mail prior to Final Inspection 218 S I6 street, B1air NE 6500$ Seaause of llmitetl()ns caused by the Infusibility to'perform detailed Inspections which would pot Interfere with reroofing work, ploase indleate compliance with the following requiremetIts folloVincs this reroofing job. Permit #: Installation DMC 1 YES NO The materials and. methods of application used far recovering or replacing the eistincd roof coveting comply with the requirements of the building code. (11807.1) [� ICE Pp,OTECTION INSTALLED - An ice barrier that consists of at Isast two layers of underlayment or of a self-adhering polymer modified bitumen sheet waswa instatiad and extends at least from the eave'a edgy to a point at least 24 'nches inside the eAe for wall line of the building. (R905.2.7.1) STRUCTURAL CoNlpoNENTs ARE SQUND: The structural roof components are capable cif supporting the roof covering system and the material and equipment loads that will be enocun{ered during installation of the roof covering system. (8907.2) Q EXIS 'ING.C91 ERING WAS : MOVEDw EAsting.roof covering was removers for one ' of the reasons required by section 8907.3 NO isTED ml^`rAL oR Ft-Asp�-- E)c1sting vent flashing metal edges, drain outlets, collars, or metal counter- flashing Were not reinstalled if rusted. (R907.6) ❑ b1�SH NC hiSTALL�D PROPI= RI..II: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions Metal flashing to which bituminous aterials are to be adhered shall be primed prior to installation. (R907.0) Signature of Primary Installe bate � I Signature of Permit Holder Date i ' I . I I I