Loading...
Checkoff Sheet 763_0001.tif i i i 09102/2014 14:49 4025027575 C AND S ROOFING INC PAGE 12 #29 I INTERNA TIONAL RESIDENTIAL CODE . CITY OF BLAIR REROOFING H C OFF S HEET Return to 131air City Hall'prior to Find inspectilon 218 1 Street, Bair, NE 68008 Oeeauso of limitations caused by the infeasibility to•perform detailed inspections which would � not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job, Permit # a1. -1 lnstallafion Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) � CE PRQ fECTl0N INSTALLEU. An Joe barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was in-stalled and extends at least from the egyt,! ache to a point of [east inches i side the exterior wall ling of the building, (8905.2,7.1) STRUCTURAL COMPONENTS ARI SOUND The structural roof components are capable cif supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (k907.2) OSTING COVF -RI14'G 1NAS REMOVED. Existing roof covering was removed for one of the reasons required by section R907.3 No RUSTED [4 ETAI 0 R FLASHkG: F- Asting vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5) Q FLASHING INS- 'ALLED PROPt LY: Flashing shall be reconstructed in acow dance with approved manufacturer's installation instructions. metal flashing to which ltumino materials are to be adhered shall be primed prior to installation. (R907 -6) j,Slgnare of Prima nstalle Date i Signature of Permit Hot ar Data _