Loading...
Checkoff Sheet 716_0001.tif i 0910212014 14:49 4025027575 C AND S ROOFING INC PAGE 11129 INTERNATIONAL RESIDENT CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall plr'ilor to Final inspection .218 B 16 Street Blair, NE 66088 Because of limitations caused by the Infeasibility fin 'perform detailed inspections which would i not int erfere with reroofing work, please i ndicate compliance with the following requirements following this reroofing job. Installation, Date: Yes No The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code, (11907.1) ICE PROT INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a. point at least 24 inohes Inslde the exterior wall line of the building. (8905.2.7.9) STRUCTI IIRAL COMPONENTS 8011 C]: The structural roof components are capable df supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (1190 7.2) I� 'EXISTING COVERING WAS REMOVRT) Existing roof covering was removed for one of the reasons required by section 8907.3 [ NO RUST1 =la M1vTAL C?I. l-A Hlt�l : Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: f=lashing shall be reoansfiructed in accordance with approved manufacturer's installation instructions. Metal flashing to which it 9no materials are to be adhered shall be primes! prior to installation. (8907.6) I I Signature o rimary nstaller Date I q- ,1 � Signature of Permit Ho or Date