Checkoff Sheet 709_0001.tif i
i
09/03/2014 19:58 779112 GOEDEN CONSTRUCTION _ PAGE ._. ___........ _..._....
20`09 INTERNATI"'I"AL RESIDENTIAL CODE
CITY OF BLAIR REROOFING t
Return to Blair City Hall prior to Final Inspection
218816 i Street, Blair, NE 68088
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job. pz
Property Address: c `
Contractor or Homeowner (if self) : _ C� rd ( 'I , c
Permit #: IVIS-2014- 0
►`► r t1 1t
Installation Date: j V
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building cede. (R907J)
iCE PROtECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building, (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are f
capable of supporting the roof covering system sand the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
E XISTING C . CIVERING WAS RE MOVED: Existing roof coveting was removed for one
of the reasons required by section 8907,3
DID NOT USE RUSTED ME w OR FLASHING: Ex isting vent
' flashing, flashing, metal edges,
drain outlets, collars or metal counter- fleshing were not reinstalled if rusted, (8907.5)
FLASHING INSTAL PROPERLY: f=lashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation. (R907.6)
•f �
Si to of Primary installer D
Signature f ermit Ho der Date
i
I
i