Loading...
Checkoff Sheet 709_0001.tif i i 09/03/2014 19:58 779112 GOEDEN CONSTRUCTION _ PAGE ._. ___........ _..._.... 20`09 INTERNATI"'I"AL RESIDENTIAL CODE CITY OF BLAIR REROOFING t Return to Blair City Hall prior to Final Inspection 218816 i Street, Blair, NE 68088 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. pz Property Address: c ` Contractor or Homeowner (if self) : _ C� rd ( 'I , c Permit #: IVIS-2014- 0 ►`► r t1 1t Installation Date: j V YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building cede. (R907J) iCE PROtECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building, (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are f capable of supporting the roof covering system sand the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) E XISTING C . CIVERING WAS RE MOVED: Existing roof coveting was removed for one of the reasons required by section 8907,3 DID NOT USE RUSTED ME w OR FLASHING: Ex isting vent ' flashing, flashing, metal edges, drain outlets, collars or metal counter- fleshing were not reinstalled if rusted, (8907.5) FLASHING INSTAL PROPERLY: f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907.6) •f � Si to of Primary installer D Signature f ermit Ho der Date i I i