Loading...
Checkoff Sheet 705_0001.tif I 09/0212014 14:49 4025027575 C AND S ROOFING INC PAGE 10/29 I _ 00 INTERNATIONAL RESr NTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET j Return to Blair City Half prior to Final Inspeation 218 S 16 Street, Blain NrE 68008 Because of limitations caused by the Infeasibility to'perform detailed Inspections which would riot interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit P 5 — Q 0 Installation Date- YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (11907,'1) i ICE PRATI -CTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer nlodlfled bitumen sheet k it�sta {led and extends at least from the eaye's edge . to a point at least 24 inohes_irtside the exterior wall line of the building. (1906,2,7.1) ( STRUCTURAL Q0MPQtJF- STS ARE SOUMD- The structural roof components are capable of supporting the roof covering system and the material and equipment loads 4 that will be encountered during installation of the roof covering system. (1907,2) EXISTING COVERING 1111.AS REM OVER Existing roof covering was removed for one of the reason; required by section 8907.3 i Q No RUSTED METAL Old FLASHING._ Existing vent flashing, metal edges, drain outlets, collars or metal counter- flaighing were not reinstalled if rusted. (RG07.0) 1 L FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in ecoordanoe � with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall he primed prior to installation. (R907.6) Signature of Primary Inataller Date Date Signature of Permit Holder