Loading...
Checkoff Sheet 524_0001.tif i j 0910212014 14:49 4025027575 C AND 5 ROOFING INC PAGE 09129 , 009 11 CITY OF BLAIR REROOFING CHECKOFF SHEET return to Blair City Hall' prior to Final In poGtlon '1 B 6 street, Blair, NE 610000 Becauso of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate oompliignce with the following requirements o ng this reroofing job. L - 7 C . Installation Datek: u I �A — YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (1907.1) ICE PROT1;CTION INSTALLED: An ice barrier that consists of at least two. layers of underlayment or of a'self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches i side the exterior wall line of the building. (R905,2.7.1) STRUCTURAL COMPONENTS ARE _SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads t that will be ericountered during Installation of the roof covering system. (8907.2) EXISTINQ CO WAS REMOVED: Existing roof covering was removed for one of the reasons rewired by section 8907.3 ( No RUSTED METAL OR FLASHING* Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (RQ07.5) FLASH INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installatil an instruotione. Me tal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (8907.6) q Signature of Primary In taller pate Signature of Permit molder Dat E_ I i I