Checkoff Sheet 524_0001.tif i
j
0910212014 14:49 4025027575 C AND 5 ROOFING INC PAGE 09129
, 009 11
CITY OF BLAIR REROOFING CHECKOFF SHEET
return to Blair City Hall' prior to Final In poGtlon
'1
B 6 street, Blair, NE 610000
Becauso of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate oompliignce with the following requirements
o ng this reroofing job.
L - 7 C .
Installation Datek: u I �A —
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (1907.1)
ICE PROT1;CTION INSTALLED: An ice barrier that consists of at least two. layers of
underlayment or of a'self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches i side the exterior
wall line of the building. (R905,2.7.1)
STRUCTURAL COMPONENTS ARE _SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
t that will be ericountered during Installation of the roof covering system. (8907.2)
EXISTINQ CO WAS REMOVED: Existing roof covering was removed for one
of the reasons rewired by section 8907.3
( No RUSTED METAL OR FLASHING* Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (RQ07.5)
FLASH INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installatil an instruotione. Me tal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (8907.6)
q
Signature of Primary In taller pate
Signature of Permit molder Dat E_
I
i
I