Loading...
Checkoff Sheet 511_0001.tif I L 09/02/2014 17:56 7790112 GOEDEN CONSTRUCTION PAGE 01 INTERNAT .- . SHEE CITY OF BLAIR REROOFING CHECKOFF Return to Blair ta Hall prior to Final Inspection 218 I Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would j not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: N e r-?t 5 Contractor or Homeowner (if self) Permit #: Installation Date: opl YES , The materials and methods of application use 'd for recovering o replacing the existing roof covering comply with the requirements of the building code (R907.1) ICE PRtOfECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed_gg to a paint at least 24 inches . inside the exterior wail line of the building. (11905.2.7.1) STRUCTURAL CeOMPONENTS ARE StOUNU: The structural roof components are r capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) EXISTING COVERING WAS REMOVED_ Existing roof covering was removed for one of the reasons required by section 89073 DIP NOT USE RUSTED META OR FLASHING: Existing ent flashing, metal edges, es, 0 drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8807.5) FLASHING INSTALLER PROPERLY: Flashing shall be reconstructed in accordance j with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.0) Sig tur a rimary Installer Date � Signature ermIt Holder Date I