Loading...
Checkoff Sheet 459_0001.tif i I 09/02/2014 14:49 4025027575 G AND S ROOFING INC PAGE 07/29 i INTERN ATIONAL RESIDENT CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blain City Hair prior to Finei Inspection 21 8 'i C street, Biair, NE-68008 Because of 11mitatlons caused by the infeasibility to perform delaiied inspections which would not interfere with reroofing work, please indicate oomplianoo with the following requirements foftWinq this mroofinq job. I Installation data: I YES NO The materials and methods of application used for recovering or raplaol6g thy: existing roof covering comply with the requirements of the building code. (8007.1) ICI; pROT )t4 INSTALLED: An ice barrier that consists of at least two layers of undarlayment or of a seif` adhsting polymer modified bitumen sheet was in stalled and extends at least from the ggn!s ed e to a point at least 2.4_ inches inside the exterior wail line o the building. (R STRUGTURAL COMPONENTS AR5 SOUND: The structural roof oompotients are capable of supporting the roof covering system and the material and equipment toads that will be encountered during installation of the roof covering system. (8007,2) EXISTING OVFI MG WAS P- EMOVF -D- Exiting roof covering was removed for one of the reasons required by section 8907,3 NCB Rt1gwt) METAL OR I=LASHIigt�� Exisfiing � r �r lied i (R907,5) outlets, collars car metal counter - flashing were n FLASHING [A sTALLF -D pPp RLY• Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to bo adhered shall be prim ad prior to installation. (8907 i§ignature +o rimary Ins lle Mate t i Signature 0 errriit Hold pate I