Checkoff Sheet 459_0001.tif i
I
09/02/2014 14:49 4025027575 G AND S ROOFING INC PAGE 07/29
i
INTERN ATIONAL RESIDENT CODE -
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blain City Hair prior to Finei Inspection
21 8 'i C street, Biair, NE-68008
Because of 11mitatlons caused by the infeasibility to perform delaiied inspections which would
not interfere with reroofing work, please indicate oomplianoo with the following requirements
foftWinq this mroofinq job.
I
Installation data:
I
YES NO
The materials and methods of application used for recovering or raplaol6g thy: existing
roof covering comply with the requirements of the building code. (8007.1)
ICI; pROT )t4 INSTALLED: An ice barrier that consists of at least two layers of
undarlayment or of a seif` adhsting polymer modified bitumen sheet was in stalled and
extends at least from the ggn!s ed e to a point at least 2.4_ inches inside the exterior
wail line o the building. (R
STRUGTURAL COMPONENTS AR5 SOUND: The structural roof oompotients are
capable of supporting the roof covering system and the material and equipment toads
that will be encountered during installation of the roof covering system. (8007,2)
EXISTING OVFI MG WAS P- EMOVF -D- Exiting roof covering was removed for one
of the reasons required by section 8907,3
NCB Rt1gwt) METAL OR I=LASHIigt�� Exisfiing � r �r lied i (R907,5)
outlets, collars car metal counter - flashing were n
FLASHING [A sTALLF -D pPp RLY• Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to bo adhered shall be prim ad prior to installation. (8907
i§ignature +o rimary Ins lle Mate
t i
Signature 0 errriit Hold pate
I