Loading...
Checkoff Sheet 457_0001.tif 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 08129 INTERNATIONAL RESIDEN TX - ITY OF LAIRREROOFING CHECKOFF SHEET Return to Blair City Wall prior to Final Inspection 218 B.1 ra street, Blair, NB 68008 Because of limitations caused by tho inftaslbility to *perform detailed inspections which would not interfere with, reroofing 'work; piaaae indicate compliance with the following requirementa ;following this reroofing job. Parma #: _ f installation DatQ: - 7- " 1 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907.9) ICE PROTECTION INSTA.LLE An ice barrier that consists of at least two layers of undariayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 'nchas inside the exterior wall line of the building. (R905- 2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable 6f supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (8907.2) _ F EXISTING coVE,RIANO WAS REMOVED. Existing roof severing was removed for one of the reasons required by sectlon 11907.3 _o. RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, obilars or metal counter -flashing were not reinstalled if rusted. (R907.6) ❑ FLASHING INSTALLED PROPERLY: Flashing shall bo reconstructed In accordance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prier to installation. (RD 07.6) Signature Prima TIMAstaller Date Signature 0 Permit Hol pate