Checkoff Sheet 427_0001.tif I
09/0212014 14:49 4025027575 C AND 5 ROOFING INC PAGE 06/29
2009 T AT TL, CODE -
CITE' O F BL.AIR REROOFING H KOFF SHEET
Return to Blair City Hall prier to Final Inspo'otion �
i
21881 Stroet, Blair, NE. 08008
Because of Iimitations caused by the infeasibility to'perform detalled Inspeafion$ which would
not interibre with reroofing work, pleaee Indicate oomplianoo Wr th the following requiromen'ts
oll nfl this reroofing jolt.
Installation Data:
YEs ND
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICI; PROTECTION INSTAL- LF-D. An ice barrier that consists of at least; two layers of
underlayment or of a self-adhering polymer modifled bitumen sheet was installe and
extends at least from the eaves ed a to a point t least 2 'nohes inside the exterior
wall line of the building. (8905.2.7.1)
STRt1GTURAL CoMPOMENTS AR pUNO: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (13907.2)
EXISTING l CUVI= E:lNC WAaBEM 0VED Existing roof covering was removed for one
' e reasons required b section 8907.3
o f #h q Y
No B JSTBID METAL, OR FLASHING= Existing verit flashing, metal edge drain
outlets, collars or metal coun ter-flashing wero riot reinstalled if rusted. (8907.5)
I
I
FLASONG INSTALLS pRU LV Flashing shall be reconstructed In accordance
with approved manufacturer`s Installation instructions. Metal flashing to which
biturgluous materials are to be adhered shall be primed prior to installation. (13907.0)
e I
Signature a unary t taller J Date
Signature of PermR Holder Date