Loading...
Checkoff Sheet 427_0001.tif I 09/0212014 14:49 4025027575 C AND 5 ROOFING INC PAGE 06/29 2009 T AT TL, CODE - CITE' O F BL.AIR REROOFING H KOFF SHEET Return to Blair City Hall prier to Final Inspo'otion � i 21881 Stroet, Blair, NE. 08008 Because of Iimitations caused by the infeasibility to'perform detalled Inspeafion$ which would not interibre with reroofing work, pleaee Indicate oomplianoo Wr th the following requiromen'ts oll nfl this reroofing jolt. Installation Data: YEs ND The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICI; PROTECTION INSTAL- LF-D. An ice barrier that consists of at least; two layers of underlayment or of a self-adhering polymer modifled bitumen sheet was installe and extends at least from the eaves ed a to a point t least 2 'nohes inside the exterior wall line of the building. (8905.2.7.1) STRt1GTURAL CoMPOMENTS AR pUNO: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (13907.2) EXISTING l CUVI= E:lNC WAaBEM 0VED Existing roof covering was removed for one ' e reasons required b section 8907.3 o f #h q Y No B JSTBID METAL, OR FLASHING= Existing verit flashing, metal edge drain outlets, collars or metal coun ter-flashing wero riot reinstalled if rusted. (8907.5) I I FLASONG INSTALLS pRU LV Flashing shall be reconstructed In accordance with approved manufacturer`s Installation instructions. Metal flashing to which biturgluous materials are to be adhered shall be primed prior to installation. (13907.0) e I Signature a unary t taller J Date Signature of PermR Holder Date