Loading...
Checkoff Sheet 420_0001.tif - i 09/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 02/29 CODE 2009, INOTERNATIONAL RESIDENTIAL C ITY OF BLAIR REROOFING CHECKO Return to Blair City Wall prior to Final Inspection 218 S 16 Street, Blair, NE, 6800,8 Because of limitations caused by t#re infeasibility to periiorm detailed inspootions which would _t interferes with rer oofing w ork, please Indicate compliance with the following requirements foll6wing this rorogfing job, 0 Installation Oato: - 7 - 2k� -1 -- YES No The materials and methods of appiloation used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) #� ICI- f?12O fFGTIQN'lNSTALLE An ioe banter that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installe and w wends at least turn the eve's ed a to a point at least 24 inches inside the exterior wall line of the building. (R91I5,21A) ST UGTURAL COMPONENTS RE SDUNI�: The sfruolural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system.'(R907.2) r=Xl8TIN.G 'G0VE i G WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 _NQ RUSTED META Ok FI_A ,9H1N0; Exlsiing vent flashing, metal edges, drain outlets, collars or nzeW counter- flashing were not reinstalled if rusted. (R907.5) FLAWNG INSTA LLED PROPFIRLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation lnstructlahs. Meta[ flashing to which bituminous materials are to be adhered shall be primed prior to installation, (R9p.6} Signature of rfmary In er - Date Signature of Permit Holder pate I i