Checkoff Sheet 420_0001.tif - i
09/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 02/29
CODE 2009, INOTERNATIONAL RESIDENTIAL
C ITY OF BLAIR REROOFING CHECKO
Return to Blair City Wall prior to Final Inspection
218 S 16 Street, Blair, NE, 6800,8
Because of limitations caused by t#re infeasibility to periiorm detailed inspootions which would
_t interferes with rer oofing w ork, please Indicate compliance with the following requirements
foll6wing this rorogfing job,
0
Installation Oato: - 7 - 2k� -1 --
YES No
The materials and methods of appiloation used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
#� ICI- f?12O fFGTIQN'lNSTALLE An ioe banter that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installe and
w wends at least turn the eve's ed a to a point at least 24 inches inside the exterior
wall line of the building. (R91I5,21A)
ST UGTURAL COMPONENTS RE SDUNI�: The sfruolural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system.'(R907.2)
r=Xl8TIN.G 'G0VE i G WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907.3
_NQ RUSTED META Ok FI_A ,9H1N0; Exlsiing vent flashing, metal edges, drain
outlets, collars or nzeW counter- flashing were not reinstalled if rusted. (R907.5)
FLAWNG INSTA LLED PROPFIRLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation lnstructlahs. Meta[ flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (R9p.6}
Signature of rfmary In er
- Date
Signature of Permit Holder pate
I
i