Checkoff Sheet 419_0001.tif i
0910212014 14:49 4025027575 C AND S ROOFING INC PAGE 05129
I RESIDENTI
CITY OF BLA IR REROOFING CHECKOFF SHEET
Return to Brain (City Hall* prior to F ina l Inspect
218 8 16 Street, Blair, NE -68008
Because of Ifin tattons oaused by the Infeasibility to detailed inspections whloh would
not inter fi,-re with reroofing work, please indicate oompliance with the fallowing requirements
foil nq this reroofing job.
hermit #: j
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering oomply with the requirements of the building code. (8907.1)
' ICEE PROTECTION [NSTALLF -U . An ice barrier'that uonsists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
exfends at least from the eaves edge to a point at Ieast 24 inches inside the exterior
wall line of the bullding, (R905.2,7,9)
STi R CTUR.AL COMPONENTS ARC sOUND -. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads,
ry that will be encountered during installation of the roof covering system. (8907.2)
rl EXISTING COVERING WAS RBiViOVgp Exjc tjng roof covering was removed for one
of the reasons required by section 8907.3
Pr � NO RUSTED METAL OR FLA 1'N (3; Existing 'cent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5)
} FIA8HING 114 1.ED i ?I,()pF- Flashing shall be reconstructed in accordance
With approved manufacturer's installation Instructions, Metal flashing to which
ituminous materials are to be adhered si�a[E be primed prior #a installation, (R�o7•a)
Signa ure of Pr ary Installer da
Signatu AParmi Hol der oaf$
I