Checkoff Sheet 417_0001.tif i;
i
69/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 04129
2009 INTERNATIONAL RESIDENTIAL CODE -
CITY O BLAIR REROOFING HE FF SHEET
Retum to Riair City Haim prior to Final Inspection
218 8 UP Street, Nair, NE- 68008
Because of [Imltatlons caused by the infeasibility W `perform defailed Inspections whloh would i
- not irnterfere with reroofing work, please Ind$cate compliance with the following requirements
f, ollowina Us reroofing job.
Permit 9: a o I X A 0 L l l S10 -qso sw n v 1 , � ,
Installation Matey
Y58 NCB
The materiels and methods of application used for recovering or replacthg the existing
roof covering comply with the requirements of the building Dade. (R907A)
ICE pl,QTEc-rION INSTALI✓1 -D : An Ice barrier that consists of at least two layers of
tinderlayment or of u self-adhering polymer modified bitumen sheet was ins. #�II�d and
extends at least from the eaye's ed a to a point at leasfi inches t side the exterior
wall line of the building. (R905.2,7.1)
• I
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
ciapable of supporting the roof covering system and the material and equipment loads
} that wlil be encountered diurincd installation of the roof covering system. (R
I� gttSTING Q0VERIM0 WAS RP- MOVED, FARting roof covering was removed for one
of the rsasons required by section R907.3
ND RUSTPW WI> T`AL C FLASHING: Exisiing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (- R907.5)
FLAS IN iNSTALLF-D PROPF-R.l.Y; Flashing shall be recanstruoted in accordance
with approved manufacturer's Installation Instructions. Metal flashing to which
d biminous materials are to be adhered shall bs primed prier to installation. (Rg97.3)
SIjgn 6hTrinlaVy Installer Date
signature cif "PermitH Date
i