Loading...
Checkoff Sheet 417_0001.tif i; i 69/02/2014 14:49 4025027575 C AND 5 ROOFING INC PAGE 04129 2009 INTERNATIONAL RESIDENTIAL CODE - CITY O BLAIR REROOFING HE FF SHEET Retum to Riair City Haim prior to Final Inspection 218 8 UP Street, Nair, NE- 68008 Because of [Imltatlons caused by the infeasibility W `perform defailed Inspections whloh would i - not irnterfere with reroofing work, please Ind$cate compliance with the following requirements f, ollowina Us reroofing job. Permit 9: a o I X A 0 L l l S10 -qso sw n v 1 , � , Installation Matey Y58 NCB The materiels and methods of application used for recovering or replacthg the existing roof covering comply with the requirements of the building Dade. (R907A) ICE pl,QTEc-rION INSTALI✓1 -D : An Ice barrier that consists of at least two layers of tinderlayment or of u self-adhering polymer modified bitumen sheet was ins. #�II�d and extends at least from the eaye's ed a to a point at leasfi inches t side the exterior wall line of the building. (R905.2,7.1) • I STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are ciapable of supporting the roof covering system and the material and equipment loads } that wlil be encountered diurincd installation of the roof covering system. (R I� gttSTING Q0VERIM0 WAS RP- MOVED, FARting roof covering was removed for one of the rsasons required by section R907.3 ND RUSTPW WI> T`AL C FLASHING: Exisiing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (- R907.5) FLAS IN iNSTALLF-D PROPF-R.l.Y; Flashing shall be recanstruoted in accordance with approved manufacturer's Installation Instructions. Metal flashing to which d biminous materials are to be adhered shall bs primed prier to installation. (Rg97.3) SIjgn 6hTrinlaVy Installer Date signature cif "PermitH Date i