Checkoff Sheet 415_0001.tif i
09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 03/29
i
r T .
CITY OF BL AIR I CHECKOFF SHEET
Return to I aIr Cit Hall prior to Final Inspection
218 s 16 tweet, Blair, NE. 68008
i3eoause of utnitafions caused by the Infeasibility to *Perform detailed inspections whioh would
not Interfere with reroofing work, please indicate compliance with the following requirements
Tallcwing. this reroofing job.
Permit #• C) 1 `A 00 `A l �+� �A�} y k
,
Installation Data- ` I k
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
IcE pgoT>=c'r[0N 1NS rA><l. ED : An toe ba' rrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was insfailed and
extends at least from the a ve'a edge to a point g al least 241nches i is de the eAerlor
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS pAI� SOUND: The structural roof c0n1P0n8nt,9 are
capable (if supporting the roof coveting system and the materlal and equipment loads
that Wil be encountered •during Installation of the FOOf covering system. (R907.2)
EXISTING COVERII rG WAS rMOVED.- l✓xistincg rcof cOvedlIg was removed for one
of the reasons required by section R907,3
Nth F�US 1'El3 ME`f A� 4R PLASHING Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6).
i
13 FLASHING INSTAL l.Ed PROPE Y: ti lashing shall be reconstructed in accordanca
With approved manufacturer's Installation Instruotions. M etal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
- I L1
SIg rs o Primary Installer bate
I
. LA'
Slgnatur . caf Perml Holder pate