Loading...
Checkoff Sheet 415_0001.tif i 09/02/2014 14:49 4025027575 C AND S ROOFING INC PAGE 03/29 i r T . CITY OF BL AIR I CHECKOFF SHEET Return to I aIr Cit Hall prior to Final Inspection 218 s 16 tweet, Blair, NE. 68008 i3eoause of utnitafions caused by the Infeasibility to *Perform detailed inspections whioh would not Interfere with reroofing work, please indicate compliance with the following requirements Tallcwing. this reroofing job. Permit #• C) 1 `A 00 `A l �+� �A�} y k , Installation Data- ` I k YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) IcE pgoT>=c'r[0N 1NS rA><l. ED : An toe ba' rrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was insfailed and extends at least from the a ve'a edge to a point g al least 241nches i is de the eAerlor wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS pAI� SOUND: The structural roof c0n1P0n8nt,9 are capable (if supporting the roof coveting system and the materlal and equipment loads that Wil be encountered •during Installation of the FOOf covering system. (R907.2) EXISTING COVERII rG WAS rMOVED.- l✓xistincg rcof cOvedlIg was removed for one of the reasons required by section R907,3 Nth F�US 1'El3 ME`f A� 4R PLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6). i 13 FLASHING INSTAL l.Ed PROPE Y: ti lashing shall be reconstructed in accordanca With approved manufacturer's Installation Instruotions. M etal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) - I L1 SIg rs o Primary Installer bate I . LA' Slgnatur . caf Perml Holder pate