Loading...
MS-2014-00349_0001.tif I . CG� 009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #• ®r I installation Date: 9 6 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of j and y erla ment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building, (R905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are Y capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I i ® NO RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain I outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i i I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) f Sig ature of Primary taller Date Signature Permit Holder Date I ! i i