MS-2014-00349_0001.tif I
. CG�
009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #•
®r
I
installation Date: 9 6
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
i
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of j
and y
erla ment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail line of the building, (R905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
Y
capable of supporting
the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
i
® NO RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain
I
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
i
i
I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
f
Sig ature of Primary taller Date
Signature Permit Holder Date
I
!
i
i