MS-2014-00715_0001.tif i
i
I
09102/2014 10:47 4025027575 C AND S ROOFING INC PAGE 06/06 j
2009 INTERNAT RESIDENTIAL COW
CITY OF BLAIR REROOFI�iQ CHECKOFF SHEET
Return to Blair City all prig, to Final Inspection
2'18 S � G Street B lair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspectlons which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing )ob. �
Property Address- 1031
^
Contractor or Homeowner (if self) ;]1
Permit #: ®2014M �A 7
Installatloo aato:
i
YE NO
The materials and - methods of application used fqr recovering or replaying the existing
roof covering comply with the requirements of the building code. (R907.1)
!CE PROtECTiON INS'lI AU-IR D ; An lee barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaves edg e. to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
' STRupuRAL COMPONENTS ARE SOUWS The struotural roof components are
capable of supporting the roof covering system► and the material and equipment loads
that will be encountered during installation of the roof covering system.. (8997.2)
E XISTING COVERING WAS REMOVED. Existing roof covering was removed for one
ref the reasons required by section R907.3
- - - ,_ y DIES Nc) USI- RUSTI=C METAL OR FL ASHING. FxiOng vent flashing, metal edges,
drain ultrets, collars or metal epunter flashing were not reinstalled if rusted. (8907.5)
i
FLASHING INSTALLr=p PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous rriateriaxis are. to be adhered shall be primed prior to installation. (89(}7.6)
Signature of Primary n � Pate
Signature of hermit Holder Date
,
i