Loading...
MS-2014-00715_0001.tif i i I 09102/2014 10:47 4025027575 C AND S ROOFING INC PAGE 06/06 j 2009 INTERNAT RESIDENTIAL COW CITY OF BLAIR REROOFI�iQ CHECKOFF SHEET Return to Blair City all prig, to Final Inspection 2'18 S � G Street B lair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspectlons which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing )ob. � Property Address- 1031 ^ Contractor or Homeowner (if self) ;]1 Permit #: ®2014M �A 7 Installatloo aato: i YE NO The materials and - methods of application used fqr recovering or replaying the existing roof covering comply with the requirements of the building code. (R907.1) !CE PROtECTiON INS'lI AU-IR D ; An lee barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaves edg e. to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ' STRupuRAL COMPONENTS ARE SOUWS The struotural roof components are capable of supporting the roof covering system► and the material and equipment loads that will be encountered during installation of the roof covering system.. (8997.2) E XISTING COVERING WAS REMOVED. Existing roof covering was removed for one ref the reasons required by section R907.3 - - - ,_ y DIES Nc) USI- RUSTI=C METAL OR FL ASHING. FxiOng vent flashing, metal edges, drain ultrets, collars or metal epunter flashing were not reinstalled if rusted. (8907.5) i FLASHING INSTALLr=p PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous rriateriaxis are. to be adhered shall be primed prior to installation. (89(}7.6) Signature of Primary n � Pate Signature of hermit Holder Date , i i