Loading...
MS-2014-00523_0001.tif i 09/02/2014 10:47 4025027575 C AND S ROOFING INC PAGE 05/05 2009 INTER"NATIONAL RESIDENTIAL CODE C Return to B lair Cit Hall prig to Final Inspection $ S 16 Street B lair, NE 68000 Secauso of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please Indicate co' mpliance with the following requirements following this reroofing job. j Property Address: 3 U S S+ i ContractQr or Homeowner ( self : Permit #: -2014® V Instal lati on fete" _ _ L1 - YES NO 4 .0 The materials and methods of application used for recovering or replac ing the existing roof covering comply with the requirements of the buiiding code. (8907.1) ICE (PROTECTION INSTALLED An ice barrier that consists of at lust two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from th eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) I .STRUCTURAL COMPONENTS ARE BOUND: The structural roof components are f capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) l;XISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE Rus`rED METAL OR FLASHING vent flashing, metal edges, drain outlets, collars or metal counter - flashing we're not reinstalled if rusted. (8,907.6) F LASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance � with approved manufacturer's installation instructions. Metal flashing to which bituqnpus materials are to be adhered shall be primed prior to installation. (R907.6) � Signature o rnma I ler pate Signature of Per"fil Holder bate.