Loading...
MS-2014-00429_0001 (2).tif I I 09/02/2014 10:47 4025027575 C AND S ROOFING INC PAGE 04106 2- 1 009" 1 INTERNAT10"'NAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to lair tihty Hall prior to Final Inspection 218816 Street, lair, NE 08008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job, Property Address: Contractor or Homeowner (if self) : '. L1(•% n SSA' r) Permit #: M 014- 1 • Installation Date: YES NO Pq The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at lust two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R9a5.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXiS'TING COVERING WAS REMOVED. Fxisting roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTEi] METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907,5) FLASHING INSTALLi =D PROPERL'Y': C=lashing shall be reconstructed in accordance with approved manufaoturer's installation instructions. Metal flashing to which fait !no Materials are to be adhered shall be primed prior to installation. (11007.6) Signatu d " ri n ' ller Date Signature 6ffyermitfi older Date j