Loading...
MS-2014-00428_0001.tif i 09102/2014 11:54 4025027575 C AND 5 ROOFING INC PAGE 01/01 2009 INTERNATIONAL RESIDE"NTIAL CORE CITY OF BLAIR REROOFING CHECKOFF SHEET 4 R eturn to Blair C ity H all prior to Filial Inspection � M S 16 treat, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not, interfere with reroofing work, please indicate compliance with the following requirements following, this reroofing job. Property Address: Roca Av r vc Contractor or Homeowner (if self) : 3� Permit #: - 2014- 00 t l Installati Date ' 1 1 Ll _ YES NO _ The materials and methods of application used for recovering ter replacing the existing roof covering gomply with the requirements of the building c ode. (8007.1) ICE PROtECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified biturnen sheet, was installed and extends at least from the cave's edge to a at least 24 inches inside the exterior wall line of the building, (R9g5.2.7.1) — STRUCTURAI, COMPONENTS ARE SOUNa: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of t he rea required by section R907.3 _DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall IJe reconstructed in accordance with approved manufaoturees installation instructions. Metal flashing to which bi i aus materiels are to be adhered shall be primed prier to installation. (8907.6) ' I Signature of Prim staller Date j Signature i Hol r Date I i i I i