Loading...
MS-2014-00422_0001.tif i Sep 02 1411:61 a The Roofing Moose 402 - 763 -8382 p.1 2009 INTERNATIONAL RESIU CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair city Hall prior to Final inspection V g S 16 Street, Biatr, N caused b the infeasibility not to Perform detailed inspections which h would Because of limitations Y n interfere with reroofing work, please indicate compliance with the following requirements foilgWLinq this reroofing job. Property Address: Contractor or Homeowner (if self) Permit #: -2014 - Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905. STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are r capable of supporting the root covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Insta er D ate Sign e a rmit Holder Date I i