555 (2).tif i
f
Aug, 29, 2014 9:44AM No, 0022 P. 2-'� L-i� j
a CA
ZUUV Ma"TERN"AT10" NA L RMSHDENTIAL CODE
C ITY L, I . REROOFIN y
Return to B lair City Hall prior to F inal I ns pection
I 61 S treet, Blair, NE 68000
Isecause of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, Tease indicate compliance with the following requirements
followina this reroofing job. .
Property Address: � �� � � � � 1 � A oy'nN
Contractor or Homeowner (if self} : 'fit I l'
Permit m MS -2014- OU
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
i
roof covering comply with the requirements of the building code. (8,907.1)
ICE PRO IN TALLEI) An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to , a point at least 24 inches inside the exterior
wall line of the building. (11905.2.7.1)
S TRUCTURAL COMPONENTS ARE SOUND: The structural roof comp' onents are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system, (8907.2)
EXISTING oyoZING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID No usE RUSTED METAL OR FL ASHING: Existing vent flashing, metal edges,
drain out[ets, collars or metal counter - flashing were not reinstalled if rusted. (0907.6)
FLASHING IN STALL ED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation 'instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (1907.6)
/v 1A ILA
q
sign #ur o Pr nary rn"WWY Date
Sig of Permit H lder mate