609 (2).tif 2009 INTERNATIONAL. RESIDENTIAL CODE
(.`,1111"'ry OF BLAIR REROOFING CHECKOFF SHEEIF
R to Blair City Hall prior to Final Inspection
218 S 16t" Street, Blair, NE 68008
Because of Iftnitatiolls CaUsed by the Infe to perforim detafled Inspections whIch woutd
ncyt inter-Pere with rerooffin `or1k, Ipleasoindleate compliance with I-,h.cx foilow-In g requirements
folkj this reroofing Job.
Property Address,-
Govitr-actor- or Homeowner (If self) 1 11-vi"
Permit m. MS-2014-
Installation Dat : 4 - `� � � ���w , �_w. �a.,.,.,mti,�.,. M�.,.�,.�,. �,.,� _
YES NO
The materials and niiethods ofapplicaflon t,ised for recovering or replacing the- existirq
roof covering qon-iply with thernequirements of the building code, (R90TI)
ICE PROtECTION INSTALLED: An icy: imrrier -that consists of at least two layers of
un(Iorlayment or of a seff -ad he ring polymer modified bitumen sheet was inis. and
exL(z, tat least frong the eave's e4jrq -to a polr t at lea&tr 24 inchq*, inside the rior
w Bae of the building. (R9062TI)
I rl'
STRUCTURAL COMPONENTS ARE SOU ill , 'The StrUcturall roof cornp'onents are.
capable Of SLIPPMUT-tg the roof covering systern and -the material and equipm-ent loads
that wili btu encountered dUring inst-ERIllation of the roof covering System, (R-9072)
1 EXISTING COVERING WAS REMOVIED: Existing roof covering was: rem ovied for One
oil the reasons recji,tired by section 8907.3
jy DID NOT USE RUSTED ME OR FLASHING-. Existing vent flashing, a-iietal edges,
d -aiii outlets, collars or nietal counter-flashing were riot reinstalted if rusted� (R907.5)
\0111 (71 FLASHI , IALLED PROPERLY. Rhstflng shaH be reconstrUcted in accordance
,
T1,F; parr ved marIUftX'.'tUf-E,11`s inistallation ins-tructions, Metal fia$hJtrI;g tr Which
bitturnill()Lls. rri-aterials are to e, adhered sh4 bee primed prior to installation. (R907.6)
A
. ... . .......
S ture 'lary lnPW1e'I"
v " Oate
S q a of FIFIry
qv P, a
te
Sighature of Perm t. 01dev Da