Checklist MS-2014-01686.tif E
j
j
1
i
3
2009 INTERNATIONAL RES IDENTIAL C M f
CITY OF f
B REROOFING CHECKOFF SHEET
Return to B lair City Hall prior to Final Inspection
218 S 16 S t reet, B l a i r, NE 68008 j
Because of limitations caused by the infeasibility' to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements 1
followin this reroofing job.
Permit#.
Cate:
In stallation �
I
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
10E PROTECTION INSTALLED; An ice barrier that consists of at least two layers of
mer modified bitumen sheet was installed and
underlayment or of a self-ad hering p of Y
extends at least from the eave's edge to a paint at least 24 inches inside the exterior
wall line of the building. (R905,2.7,1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads j
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMaVED. Existing roof covering was removed for one
of the reasons required by section R907.3
r
i
ng vent flashing, metal edges, drain
NO DUSTED METAL OR FLASHING; Exist]
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) j
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitum nous materials are to be adhered shall be primed prior to installation. (R907.6)
��'�
Signature of Primary Instal Date
Installer I
I W i
sign
ko er Date E
t