Loading...
Checklist MS-2014-01686.tif E j j 1 i 3 2009 INTERNATIONAL RES IDENTIAL C M f CITY OF f B REROOFING CHECKOFF SHEET Return to B lair City Hall prior to Final Inspection 218 S 16 S t reet, B l a i r, NE 68008 j Because of limitations caused by the infeasibility' to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements 1 followin this reroofing job. Permit#. Cate: In stallation � I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 10E PROTECTION INSTALLED; An ice barrier that consists of at least two layers of mer modified bitumen sheet was installed and underlayment or of a self-ad hering p of Y extends at least from the eave's edge to a paint at least 24 inches inside the exterior wall line of the building. (R905,2.7,1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads j that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMaVED. Existing roof covering was removed for one of the reasons required by section R907.3 r i ng vent flashing, metal edges, drain NO DUSTED METAL OR FLASHING; Exist] outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) j FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitum nous materials are to be adhered shall be primed prior to installation. (R907.6) ��'� Signature of Primary Instal Date Installer I I W i sign ko er Date E t