Checklist MS-2014-01079.tif Aug.22.2014 03:10 PM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 4/ 4
tit: E
MM& rmw
20uu INTERNATIur4AL R'S1 NT A UUU
CITY OF BLAIR REROOFING CHECKOFF SHEET
i
i
f
r ♦ �
/ I
r
f
Re turn t o B lai r C ity Hall p rior to inal Inspection
218 S I (P' street, 131air, NE 68008
Eeoause
o f limitations caused by the lnfoasihility tO perform det ailed inspections which would ts
no interfere with reroofingg work, please Indicate compliance with the following req�lr m n
foilo#in this reroofing job.
Permit #. 1..
installation D ate.
NYES NO
The materials and methods of application used for recove or replacing the existing
roof covering comply with the requirennents of the building code. (119071)
iCF PROIECTION INSTALL An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modifiiod bitumen sleet was 'nsfallad and
extends a. leas fry the eev'se tt a point at leas i ches i side the exterior
wall line of the building. (R905.2.7.1)
TRtj TUBA ,.COME, tN S ARE SaUNQ: The structural roof components are
capable of supporting the roof covering system and the material and equipment lows
that will be encountered during linstallation of the roof covering system. (11907.2)
�� Ex istin g EX1'Tii`� �av� nib �� Rl��� g roof covering was removed for one
Of the rea s required by s ection k907.
No jU rED MFET'AL 0H ELAS_HING. 5xisting vent flashing; metal edges, drain
outlets, oollars or metal counter- flashing were not reinstalled if rusted, (1190 7.5)
l�Lq,3Hlhi l ISTAI LED pR0P LX Flashing shall he reconstructed in accordance
with approved manufacturer's installation instruotions. Metal flashing to which
biturninous rnaterlals are to be adhered shall be primed prior to installation (8907.6)
Signature of P'ri taller at
1 tire 6 errrt t Holder Da
f